Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Estimated factory cost breakdown for a Wraith III Radiator.

Identifier  ExFiles\Box 148\5\  scan0187
Date  13th August 1937
  
To Rm{William Robotham - Chief Engineer}/STD.from G/Rb.{R. Bowen}
G/Rb.{R. Bowen}15/K/73/R.16837.
126 O
Wraith III Radiator Sec.5250.
hdw Rm{William Robotham - Chief Engineer}/STD
Rm{William Robotham - Chief Engineer}/STD.8/AP.13.8.37.
In accordance with your request for cost figures for the Wraith Radiator to LOP.EW.1205 less shell parts as shown in your memo the following is the estimated factory cost.
£. s. d.{John DeLooze - Company Secretary}
Material 4 12 1
Labour 2 5 0
175% Charges 3 18 9
-------
£10 15 10
G/Rb.{R. Bowen} ASK
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙