Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
List of completed design modifications for Bentley and Spectre chassis.

Identifier  ExFiles\Box 30\4\  Scan189
Date  14th May 1934 guessed
  
ITEM (2) DESIGN POSITION.
---------------------------------------------
BENTLEY CONTINUED:-

Modification to side spare wheel carrier - stiffer tubes. Completed.

Controlled dampers - oil pipe layout and connections. Completed.

Carburetter modifications to prevent petrol spilling when flooding. Completed.

Starting handle tunnel cover - modified hinge pin. Completed.

Addition of stiffness to radiator grille. Completed.

Steering column modification - Works request - detail modifications. Completed.

Strengthened rear shock damper suspension. Completed.

S.U.Carburetter floatchamber needle valve modifications to reduce flooding tendency. Completed.

Mounting of P.100 headlamps. Completed.

Hand throttle control - customer's special requirement. Completed.

SPECTRECodename for Phantom III CHASSIS.
-------------------

Frame - rear end - springs and shock dampers. Completed.

Rear springs - aft shackle. Completed.

Pedals. Completed.

Exhaust piping - downtakes. Completed.

Brake linkage. Completed.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙