Letter to Ferodo Ltd. explaining that pulley tests have been delayed and likely dropped due to the prioritisation of aero work.


Identifier  ExFiles\Box 121\1\  scan0305
Date  20th August 1940
  
Copy to Rm. {William Robotham - Chief Engineer}

1029

BY {R.W. Bailey - Chief Engineer} /Ed. {J. L. Edwards} 4/P.

20th August 1940.

Messrs. Ferodo Ltd.,
Chapel-en-le-Frith,
Derbys.

For the attention of Mr. W.E.Shilton, Technical Dept.

Dear Sirs,

Many thanks for your letter of the 15th instant. I am very sorry not to have written you before, but we have all been extremely busy on Aero work, and chassis experimental work has slipped very much to the background.

I am afraid I am not now in a position to state definitely whether or not we still propose to carry on with the pulley tests, but should imagine this job has been dropped for the time being.

I am forwarding your letter to our Chassis Development Engineer, who will no doubt write you should he wish to continue with the job.

Yours faithfully,

For ROLLS-ROYCE LIMITED.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙