Letter to Ferodo Ltd. explaining that pulley tests have been delayed and likely dropped due to the prioritisation of aero work.
| Identifier | ExFiles\Box 121\1\ scan0305 | |
| Date | 20th August 1940 | |
| Copy to Rm. {William Robotham - Chief Engineer} 1029 BY {R.W. Bailey - Chief Engineer} /Ed. {J. L. Edwards} 4/P. 20th August 1940. Messrs. Ferodo Ltd., Chapel-en-le-Frith, Derbys. For the attention of Mr. W.E.Shilton, Technical Dept. Dear Sirs, Many thanks for your letter of the 15th instant. I am very sorry not to have written you before, but we have all been extremely busy on Aero work, and chassis experimental work has slipped very much to the background. I am afraid I am not now in a position to state definitely whether or not we still propose to carry on with the pulley tests, but should imagine this job has been dropped for the time being. I am forwarding your letter to our Chassis Development Engineer, who will no doubt write you should he wish to continue with the job. Yours faithfully, For ROLLS-ROYCE LIMITED. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
