Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Progress report on the development of various components for the Wraith model.

Identifier  ExFiles\Box 6\6\  06-page058
Date  5th November 1936
  
600 WRAITH. Y1049 5.11.36.

2nd. MOTION SHAFT - Cry to have schemes issued by 10th.
LUB. OF SHAFTS.

GEAR CUTTING TACKLE. - Promise by Cassell.

CHANGE SPEED & - Gry.{Shadwell Grylls} to get details by the 10th.
HAND BRAKE.

SERVO DRIVE. - Details. Cassell to have forging position by 10th.

SPEEDO. DRIVE. - Position 10th.

SERVO LEVERS. - Martindale to have report on simplification by 10th.

AXLE. - 20/25 axle. Rn.{Mr Robinson} to see E and get drawings released for tubes and anchorage brackets.
Brake gear also to be released by the 10th.

CRANKCASE. - Promise patterns 21st. inst.

WHEELCASE. - Patterns.

FRAME - No promise.
Gry.{Shadwell Grylls} to go over with Butterworth before Tuesday 10th.
Position. Forging promises to be in at the same time.

SPRINGS. Les.{Ivan A. Leslie} to give promise in a weeks time.
(Rear) Springs brackets. Cassell to get date from D.O.

FRONT SUSPENSION.
Forgings. Next week Cassell to have dates.

STEERING.
Cassell. Penilever promises & Cross steering.

REAR SHOCK DAMPERS.
Forgings and casting Cassell.

GEARBOX.
Pattern 14.11.36 completion.
Selectors. Cassell Forgings.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙