Standardisation proposal for the 20 HP Steering Wheel.
| Identifier | ExFiles\Box 106\3\ scan0232 | |
| Date | 4th April 1929 | |
| STANDARDISATION of CHASSIS PARTS. Description of Parts: M {Mr Moon / Mr Moore} /Ph 20 HP. STEERING WHEEL. Origin: Request from Sales. Experimental Test Report: This wheel is 17¾" outside diameter with a thinner section rim. It has been agreed to by Sales. Road Test Report: We shall have run these wheels a long way on experimental cars before they come on production. X No. 5430 Drawing No. Part List A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part: Weight of New Part: Difference per Car: £0-7-9 Decrease Cost of Old Part: £ 1-12-9 Cost of New Part: £ 1-5-0 Difference per Car: £0-7-9 Signature from Cost Dept. that above is correct: GHW 9/5/29 by 11/5/29 Cost of Parts in Works which will be scrapped if commenced on:- Series..........£...... Series..........£...... Series..........£...... INITIALS/REMARKS TABLE: INITIAL: Bf.Sg. {Arthur F. Sidgreaves - MD} | DATE: 13-5-29 | REMARKS: Agreed. Sg. {Arthur F. Sidgreaves - MD} INITIAL: R. {Sir Henry Royce} | DATE: | REMARKS: Agreed, but are we sure it is not too large for the room - R.H. elbow on these cars of smaller width than the 40/50 - also the lower controls should be fitted without delay. INITIAL: WOR. {Arthur Wormald - General Works Manager} | DATE: | REMARKS: INITIAL: RG. {Mr Rowledge} | DATE: | REMARKS: INITIAL: DA. {Bernard Day - Chassis Design} | DATE: 9.4.29 | REMARKS: Agreed. DA. {Bernard Day - Chassis Design} INITIAL: BY. {R.W. Bailey - Chief Engineer} | DATE: 7.4.29 | REMARKS: Agreed. BY. {R.W. Bailey - Chief Engineer} INITIAL: EP. {G. Eric Platford - Chief Quality Engineer} | DATE: 6.4.29 | REMARKS: Should like to try one - please say when I can do this. EP. {G. Eric Platford - Chief Quality Engineer} INITIAL: E. {Mr Elliott - Chief Engineer} | DATE: 10.4.29 | REMARKS: Agreed. E. {Mr Elliott - Chief Engineer} INITIAL: PN. {Mr Northey} | DATE: 5.4.29 | REMARKS: Agreed. PN. {Mr Northey} INITIAL: CWB. | DATE: | REMARKS: INITIAL: Hs. {Lord Ernest Hives - Chair} | DATE: 4.4.29 | REMARKS: Agreed. Hs. {Lord Ernest Hives - Chair} STAMPS: [J.S. MAY], [RECEIVED 13 MAY 1929], [20.H], [CHAS] | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
