Standardisation of the Phantom Rocker Cover to prevent it working loose and to make an oil-tight joint.
| Identifier | ExFiles\Box 171\1\ img163 | |
| Date | 25th September 1928 | |
| RR 755 REVISED (10H) (D.C. 777-29-2-28) Ms C.L.Y P COMPLETED 8.12.28 STANDARDISATION of CHASSIS PARTS. Date 25.9.28 Description of Parts. PHANTOM ROCKER COVER. Origin. To prevent cover working loose. To make an oil-tight joint. 8090 X No.70 90 Drawing E.77883 No.Sch. 1062 Part Fig.3. List Experimental Test Report. Fitted to 12-EX, 10-EX and tested on unit test bed. It is fitted with a felt pad which prevents the oil leaking out and down the cyl. walls. It has a definite load holding it down by spring under the thumb nuts. Road Test Report. There has been no trouble with cover working loose on 12-EX and 10-EX and cyl. walls have been free from oil leaking from cover during 1000 miles test. This is an improvement with regard to damping tappet noises. A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. [Stamped across center] CHANGE Weight of Old Part. Cost of Old Part. £ 2. 16. 4 Weight of New Part. Cost of New Part. Wor. {Arthur Wormald - General Works Manager} £ 2. 18. 1 Difference per Car. Difference per Car. £0. 4. 9d. increase. Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Ro. {C. C. Rose - Export Manager} 6.12.28. Cost of Parts in Works which will be scrapped if commenced on :- Series.........£......... Series.........£......... Series.........£......... INITIAL | DATE | REMARKS BJ. | 7.12.28 | Agreed. B.J. R. {Sir Henry Royce} | 26/9/28 | Agreed FHR- WOR. {Arthur Wormald - General Works Manager} | 27.9.28 | Agreed. Wor. {Arthur Wormald - General Works Manager} RG. {Mr Rowledge} | 4.10.28 | Agreed. RG. {Mr Rowledge} DA. {Bernard Day - Chassis Design} | 27.9.28 | Agreed. DA. {Bernard Day - Chassis Design} BY. {R.W. Bailey - Chief Engineer} | 26.9.28 | Agreed. BY. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} | 25.9.28 | Agreed. EP. {G. Eric Platford - Chief Quality Engineer} E. {Mr Elliott - Chief Engineer} | 28/9/28 | Agreed E. {Mr Elliott - Chief Engineer} PN. {Mr Northey} | 3.10.28 | Agreed. PN. {Mr Northey} CWB. | 26.9.28 | Agreed. CWB. Hs. {Lord Ernest Hives - Chair} | 25.9.28 | Agreed. Hs. {Lord Ernest Hives - Chair} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).