From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Experimental design and production status of shock dampers for the Phantom II and 20/25 HP chassis.
Identifier | ExFiles\Box 16\4\ Scan279 | |
Date | 13th April 1931 | |
Hs{Lord Ernest Hives - Chair}/Rm.{William Robotham - Chief Engineer} c. Hs{Lord Ernest Hives - Chair}/CWH. [crossed out] c. BY/HEB.{H. Biraben} [crossed out] X7520 BY6/G.13.4.31. X7520, XJ520. [STAMP: RECEIVED 14 APR 1931] SHOCK DAMPERS. The position in regard to the above is as follows :- 1/- We have completed and issued experimentally only a shock damper to drawing F.83611 suitable for the rear of both L.H. and R.H. Phan. 11 chassis. 2/- We have issued experimentally the scheme shown on N. Sch. 3244, which introduces an oil pipe from the low pressure valve to pour oil over the working end of the connection. 3/- We are producing designs of a similar type on the front damper of the 20/25 HP., the same castings and pieces can be used with the exception of the lever and connecting link, which, however, follows the design for similar parts shown on F.83611. The Works have been told to go slow on all the various parts, but we cannot stop work on any of these dampers until we have something which will definitely replace them in production. We anticipate completing the 20/25 HP. modifications this week. 134 [handwritten] BY.{R.W. Bailey - Chief Engineer} | ||