Standardisation of low rating front road springs for chassis to overcome riding complaints.
| Identifier | ExFiles\Box 171\1\ img187 | |
| Date | 10th March 1930 | |
| RR 789 REVISED (10M) (DF 687 4-1-29) BM. 2/5943 ORIGINAL (Stamped) COMPLETED 27.3.30 (Stamped) STANDARDISATION of CHASSIS PARTS. Date 10.3.30 X No. 8410 Drawing No. Part List Description of Parts: LOW RATING FRONT ROAD SPRINGS. Origin: To assist in overcoming riding complaints. Experimental Test Report: Run 40 hours on bumping rig before any failure took place. Road Test Report: Tried on two repair cars which pitched badly and produced a marked improvement. Required for a number of customers whom we have not yet been able to satisfy. HAND (Stamped Diagonally) Weight of Old Part: £ Cost of Old Part: See memo Weight of New Part: £ Cost of New Part: attached. Difference per Car: £ Difference per Car: Agreed-Wor. {Arthur Wormald - General Works Manager} Signature from Cost Dept. that above is correct: G {Mr Griffiths - Chief Accountant / Mr Gnapp} /RO {C. C. Rose - Export Manager} 24.3.30. G. {Mr Griffiths - Chief Accountant / Mr Gnapp} 25.3.30. Right Side Box: A [TICK] Scrap and replace at all costs, including Chassis already delivered to Customers. B [ ] Scrap and replace on Chassis in Works. C [TICK] Scrap present stock and replace on all Chassis not yet handed to test. D [ ] Use existing stock Alteration effective on future Chassis. Cost of Parts in Works which will be scrapped if commenced on:- Series.........£....... Series.........£....... Series.........£....... Approval Table: INITIAL, DATE, REMARKS BX Sg. {Arthur F. Sidgreaves - MD} , 26.3.30, Agreed Sg. {Arthur F. Sidgreaves - MD} R. {Sir Henry Royce} , Mar 20th, p.p. R. {Sir Henry Royce} Rg. {Mr Rowledge} By. {R.W. Bailey - Chief Engineer} CB. (handwritten signature) WOR. {Arthur Wormald - General Works Manager} , 11.3.30, Agreed Wor. {Arthur Wormald - General Works Manager} RG. {Mr Rowledge} , 10.3.30, Agreed Rg. {Mr Rowledge} DA. {Bernard Day - Chassis Design} , 11.3.30, Agreed Da. {Bernard Day - Chassis Design} BY. {R.W. Bailey - Chief Engineer} , 11.3.30, Agreed BY. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} , 10.3.30, Agreed - Phantom 1 only. EP. {G. Eric Platford - Chief Quality Engineer} E. {Mr Elliott - Chief Engineer} , 11.3.30, Agreed AE. PN. {Mr Northey} , 17.3.30, Agreed PN. {Mr Northey} CWB., 11.3.30, Agreed C. HS. {Lord Ernest Hives - Chair} , [no date], HS {Lord Ernest Hives - Chair} /Rm. {William Robotham - Chief Engineer} Agreed | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
