Standardisation of weaker springs in the side steering tube to reduce steering shocks.
Identifier | ExFiles\Box 171\1\ img075 | |
Date | 26th November 1926 | |
RR 755 REVISED (10H) (DE 444 6-10-26) BM. ORIGINAL COMPLETED 23.12.26 STANDARDISATION of CHASSIS PARTS. Date 26.11.26 Description of Parts. WEAKER SPRINGS IN SIDE STEERING TUBE. X No. 8430 (8450 is crossed out) Drawing No. F.7610B Part List A Scrap and replace at all costs, including Chassis already delivered to Customers. [X] B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Origin. To reduce steering shocks. Experimental Test Report. 1500 lbs. side steering tube springs were run with the lightened axle in France 10,000 miles. It is therefore proposed to standardise these springs with this axle. Road Test Report. These springs effect a very pronounced reduction in road shocks and yet give a selective steering with the new axle. Weight of Old Part. Cost of Old Part. £ 1. 8. 0d. Weight of New Part. Cost of New Part. £ 1. 16. 0d. Difference per Car. Difference per Car. £ 8. 0d. increase. Cost of Parts in Works which will be scrapped if commenced on:- Series..........£.......... Series..........£.......... Series..........£.......... Signature from Cost Dept. that above is correct. My/Rb.{R. Bowen} 21.12.26 INITIAL DATE REMARKS BJ. 23.12.26 Agreed. B.Johnson. R.{Sir Henry Royce} 1/12/26 Agreed. R.R. WOR.{Arthur Wormald - General Works Manager} 29.11.26 Agreed. Wor.{Arthur Wormald - General Works Manager} RG.{Mr Rowledge} 29.11.26 Agreed. Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} 2.12.26 Agreed. Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} 30.11.26 Agreed. BY.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} 29.11.26 Agreed. EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} 1/12/26 Agreed. OE PN.{Mr Northey} 30.11.26 Agreed. PN.{Mr Northey} CWB. 30.11.26 Agreed. CWB. HS.{Lord Ernest Hives - Chair} 26.11.26 Agreed. Hs.{Lord Ernest Hives - Chair} [Green Stamp: DALTON] [Green Stamp: P.L.] | ||