Rolls-Royce Archives
         « Prev  Box Series  Next »        

Standardisation of side spare wheel carriers with steadying stays, replacing 5/16' bolts with 3/8' bolts.


Identifier  ExFiles\Box 171\2\  img024
Date  12th August 1932
  
RR 75B (10M) (19120, 13-10-31) BM. 3/7588.
ORIGINAL
COMPLETED 13.9.32
STANDARDISATION of CHASSIS PARTS.
Date 12.8.32.
X No. 7600
Drawing No. 3021
Part List
Description of Parts. SIDE SPARE WHEEL CARRIERS WITH STEADYING STAYS IN FRAME USING 3/8" BOLTS REPLACING 5/16" BOLTS.
Origin. To prevent distortion of chassis frame, thereby steadying spare wheels.
Experimental Test Report. Fitted on Bump test chassis and proved satisfactory.
Road Test Report. Fitted to 19-EX and ran 10,000 miles in France. The 5/16" bolts failed holding brackets to frame. 3/8" bolts fitted were OK. Spare wheels were steadier with these brackets fitted.
Weight of Old Part.
Cost of Old Part. £ 10/7d.
Cost of Parts in Works which will be scrapped if commenced on:-
Series...£...
Series...£...
Weight of New Part.
Cost of New Part. £ 10/11½d. {John DeLooze - Company Secretary}
Difference per Car.
Difference per Car. £ 4½d. {John DeLooze - Company Secretary} Increase.
Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /RD/N. 9.9.32. Wor. {Arthur Wormald - General Works Manager} G. {Mr Griffiths - Chief Accountant / Mr Gnapp} 9.9.32.
INITIAL | DATE | REMARKS
SG. {Arthur F. Sidgreaves - MD} | 12.9.32. | Agreed Sg. {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} | 20/8/32 | Agreed SMR
WOR. {Arthur Wormald - General Works Manager} | 16.8.32 | Agreed Wor. {Arthur Wormald - General Works Manager}
C. | 16.8.32 | Agreed C.
RG. {Mr Rowledge} | 16.8.32 | Agreed Rg. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 18.8.32 | Agreed Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 16.8.32 | Agreed By. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 15.8.32. | Agreed EP. {G. Eric Platford - Chief Quality Engineer} & Mx. {John H Maddocks - Chief Proving Officer}
E. {Mr Elliott - Chief Engineer} | 19.8.32. | Agreed AE.
PN. {Mr Northey} | 31.8.32. | Agreed PN. {Mr Northey}
HS. {Lord Ernest Hives - Chair} | | Agreed Hs. {Lord Ernest Hives - Chair}
[Stamp] ORPHAN
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙