From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a paraffin waxed paper condenser, changing from .30 mf to .23 mf capacity with a reinforced case bottom.

Identifier  ExFiles\Box 165\5\  img039
Date  15th October 1931
  
RR 785 (IOH) (S459, 24-10-30) 6/3155.
x6113
COMPLETED 28. 1. 32.
STANDARDISATION of CHASSIS PARTS.
Date 15.10.31
X No. 6037
Drawing No. 52453/4.
Part List
Description of Parts. PARAFFIN WAXED PAPER CONDENSER OF .23 mf. CAPACITY INSTEAD OF .30 mf. AND WITH REINFORCED CASE BOTTOM.
Origin. To improve the surface condition of the tungsten contact points and maintain capacity constant over ranges of temperature. Also prevents damage to condenser from distributor.
Experimental Test Report. Road Test Report.
Bench tests shows a less tendency for oxidation to occur on the points. Condenser capacity also remains constant over a long period of time and does not increase with temperature.
Completed 22,000 miles running on 25-EX. Point condition very satisfactory in view of the miles run.
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock. Alteration effective on future Chassis.
Weight of Old Part.
Cost of Old Part. £ -
Weight of New Part.
Cost of New Part. £ -
Difference per Car.
Difference per Car. £ Negligible
Signature from Cost Dept. that above is correct. GRH 28/1/32
Cost of Parts in Works which will be scrapped if commenced on :-
Series........£.......
Series........£.......
Series........£.......
TABLE DATA:
INITIAL | DATE | REMARKS
SG.{Arthur F. Sidgreaves - MD} | 27-1-32 | Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 21.10.31 | Agreed FHR.
WOR.{Arthur Wormald - General Works Manager} | 16.10.31 | Agreed Wor.{Arthur Wormald - General Works Manager}
C. | 17.10.31 | Agreed C.
RG.{Mr Rowledge} | 19.10.31 | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 19.10.31 | Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 16.10.31 | Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 16.10.31 | Agreed EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 22.10.31 | Agreed AE.
PN.{Mr Northey} | 19.10.31 | Agreed PN.{Mr Northey}
HS.{Lord Ernest Hives - Chair} | | Agreed.
[Handwritten on left margin]: G/JH
[Purple Stamp]: S.T.O./H.F./9/125
[Blue Stamp]: Received 27 JAN 1932
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙