Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation document for a split, oval ground piston designed to eliminate piston knocks.

Identifier  ExFiles\Box 77\3\  scan0043
Date  22th November 1919
  
R.R. .J55 (3 H) (S F.{Mr Friese} 621, 2-5-19) C. 2361.
STANDARDISATION of CHASSIS PARTS. Date 22.11.19.
Description of Parts.
Split Piston. Oval ground, split axially and circumferentially giving uniform flexibility on the whole length of fitting portion.
Origin.
The elimination of piston knocks.
Drawing No. N.2494 High Comp, N.2495 Low
Part List. N.2684.
Experimental Test Report.
Extract from EH1/LG71119.
These pistons have run 100 hours on the bench test.
From the results of tests we consider it is quite safe to use these split type pistons until we have proved the Ram type piston.
Road Test Report.
See EP{G. Eric Platford - Chief Quality Engineer}9/F18.11.19. attached.
Signature of Exp. Dept. that above is correct. (Sgd.) E.Hives.
Weight of Old Part. Cost of Old Part. £
Weight of New Part. Cost of New Part. £
Difference per Car. £
Cost of Parts in Works and Stores which will be scrapped if commenced on:-
Series..........£..........
Series..........£..........
Series..........£..........
Storekeeper advised re above.
Storekeeper's Signature.
Signature of Mr. DELOOZE that above is correct.
SIGNATURES | DATE | REMARKS
Mr. JOHNSON. | 8.12.19 | Agreed, subject to Bx/7/W61219
Mr. ROYCE. | 29.11.19 | Agreed that these pistons are the best we have tested & that all pistons will have some slight defects, but not to be supercritical. FHR.
Mr. WORMALD. | 24.11.19 | Agreed, they are the best we have tested so far. Wor.{Arthur Wormald - General Works Manager}
Mr. NADIN. | |
Mr. PLATFORD. | 24.11.19 | Agreed, until Ram piston developed which should be pushed. EP.{G. Eric Platford - Chief Quality Engineer} See EP{G. Eric Platford - Chief Quality Engineer}9/F181119 attached.
Mr. NORTHEY. | 24.11.19 | Agreed. PN.{Mr Northey}
Mr. BAILEY. | 24.11.19 | Agreed as above. By.{R.W. Bailey - Chief Engineer}
Mr. BARRINGTON. | 24.11.19 | Agreed. To be used as a trial until something better is proved. Bn.{W.O. Bentley / Mr Barrington}
Mr. DAY. | 24.11.19 | Agreed. Da.{Bernard Day - Chassis Design}
  
  