Standardisation of steel shells for main crankshaft bearings.

Identifier  ExFiles\Box 14\2\  Scan002
Date  22th September 1926
  
H3
RR 755 (10M) (DB{Donald Bastow - Suspensions}130 12-9-24) MS 301225
Handwritten: X7010
COMPLETED 27.10.26
STANDARDISATION of CHASSIS PARTS.
Date 22.9.26

Box 1:
Description of Parts: STEEL SHELLS FOR MAIN CRANKSHAFT BEARINGS.
Origin: To improve reliability.

Box 2 (Left):
Experimental Test Report:
9000 miles in France fitted to 12-EX.
Bearings with steel shells are standard on aero engines.
19-12-24

Box 2 (Right):
Road Test Report:
No trouble or failure with bearings during the test.

Box 3 (Right):
X No. 7010.
Drawing No.
Part List
A [X] Scrap and replace at all costs including Chassis already delivered to customers.
B [ ] Scrap and replace on Chassis in works.
C [ ] Scrap present stock and replace on all Chassis not yet handed to test.
D [ ] Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on:-
Series ....... £ ......
Series ....... £ ......
Series ....... £ ......

Box 4 (Left):
Weight of Old Part:
Weight of New Part:
Difference per Car:

Box 4 (Right):
Cost of Old Part: £ 2. 0. 9d.
Cost of New Part: £ 2. 12. 9d.
Difference per Car: £ 12. 0d. increase.

Signature of Mr. De LOOZE that above is correct.

Signatures Table:
SIGNATURES, DATE, REMARKS
[Signature] C.W.B., 24.9.26, Agreed., CWB.
MR. B. JOHNSON, 27.X.26, agreed, [illegible]
MR. ROYCE, 25.9.26, Agreed., FHR.
MR. WORMALD, 23.9.26, Agreed., Wor.{Arthur Wormald - General Works Manager}
MR. ROWLEDGE, 27.9.26, Agreed., RG.{Mr Rowledge}
MR. DAY, 27.9.26, Agreed., Da.{Bernard Day - Chassis Design}
MR. BAILEY, 11.10.26, Agreed., BY.{R.W. Bailey - Chief Engineer}
MR. PLATFORD, 23.9.26, Agreed., EP.{G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT, 27.9.26, Agreed., E.{Mr Elliott - Chief Engineer}
MR. NORTHEY, 24.9.26, Agreed. c, PN.{Mr Northey}
MR. HIVES, 22.9.26, Agreed., Hs.{Lord Ernest Hives - Chair}

STAMPS:
Large green stamp across center: PHANTOM
Purple stamp: RECEIVED [illegible]
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙