Rolls-Royce Archives
         « Prev  Box Series  Next »        

Instruction to hold work on a list of engine mounting parts for six Wraith III chassis.


Identifier  ExFiles\Box 8\10\  10-page167
Date  7th December 1937
  
F. {Mr Friese} H-RNC/CAN.
C. Row/Mg.
C. R.PL.
S. RHO.
C. Dav/Grys.
ST. {Capt. P. R. Strong} H-S/ART
SY-RNC/SBT.

627

BY {R.W. Bailey - Chief Engineer} /HSB/B.7.12.37.

WRAITH III CHASSIS - 6 SETS.

FRAME AND FITTINGS - SEC:7000.

RE :- ENGINE MOUNTING.

In view of the decision to fit the Offset Triangular High Engine Mounting to E.CD.273, will you please arrange to hold up work on the following for the 6 sets, until we issue further instructions :-

SEC:7000.
FW.174 Bracket on Crankcase - R.H. 1 off.
FW.175 " " " - L.H. 1 "
FW.177 Bottom Retaining Flange. 2 "
FW.178 Cover. 2 "
FW.182 Distance Piece. 2 "
FW.183 Surface Washer. 2 "
FW.184 - 190 - Adjusting Washer. 2 " to suit.
FW.1307 Container. 2 "
FW.1308 Top Retaining Flange. 2 "
FW.1386 Rubber Block. 2 "
F.71918 Centre Bolt. 2 "
FW.368 Engine Support Bracket. R.H. 1 "
FW.369 " " " L.H. 1 "
FW.370 " " Top Plate. R.H. 1 "
FW.371 " " " L.H. 1 "
FW.357 Eye Bolt. 4 "
FW.358-61 Adjusting Washer. 2 " to suit.
FW.366 Anchor Bracket. 2 "
E.60527 Distance Piece. 1 "
FW.1094 Crossmember. 1 "
FW.1364 " Bracket - R.H. 1 "
FW.1365 " " - L.H. 1 "

BY {R.W. Bailey - Chief Engineer} /HSB.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙