Letter to The Hoyt Metal Co. Ltd. detailing the failure of their 'Eleven H. metal' in Bentley main bearing tests and arranging for a new test with 'Satco' metal.
| Identifier | ExFiles\Box 115\1\ scan0153 | |
| Date | 26th November 1936 | |
| 1020 Experimental Department 26th November 1936. Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell} 20/AP. The Hoyt Metal Co.Ltd., Putney, LONDON S.W.15. Dear Sirs, You will no doubt have heard from your Mr.Shelton of the result of our test with Eleven H. {Arthur M. Hanbury - Head Complaints} metal in the Bentley main bearings. Due to poor adhesion the metal is coming away in chunks on several bearings, on the other hand there are several where the surface is beginning to crack up with signs of fatigue. The running carried out was 11 hours Endurance at speeds ranging from 4000 R.P.M. to 4500 R.P.M. with an oil inlet temperature to bearings of 100°C. For a bearing to be at all promising we should expect to run at least 25 hours under the above conditions without sign of trouble and say a figure of 50 hours before actual failure. Up to the present time this is the only set of bearings with your metal that we have run, but will shortly have on test big end bearings in Eleven H. {Arthur M. Hanbury - Head Complaints} and Z.3. on the Phantom and main bearings in Z.3. on the Bentley. During our conversation with Mr.Shelton it was decided that we should send you a set of Bentley main bearing shells which you would metal for us with "Satco" free of charge. Following the metalling they should be sent back here in the rough state for us to carry out the final machining operations. Enclosed are the actual finished drawings but these will enable you to leave the necessary surplus metal for our machining. Yours faithfully, FOR ROLLS-ROYCE LTD. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
