From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Work instructions for modifying a B.27.LE chassis.
Identifier | ExFiles\Box 160\4\ scan0088 | |
Date | 12th July 1939 | |
1379 To HPS {Horace Percy Smith - Experimental Factory Mgr} /RH. {R. Hollingworth} Rm {William Robotham - Chief Engineer} /GR. {George Ratcliffe} 9/JH.12.7.39. B.27.LE. Chassis. Remove all hydraulic dampers and governor box and hand to W.Bell for fitting to large 1½" dia. bellows and increasing pressure of pump. Remove alum front brake drums, cross steering tube and levers. Refit standard B.II parts for 16 x 6.50 wheels Examine all danger points. Rm {William Robotham - Chief Engineer} /GR. {George Ratcliffe} | ||