Rolls-Royce Archives
         « Prev  Box Series  Next »        

Status update on the machining of various engine bearings made from Hoyts Z.3. Metal.


Identifier  ExFiles\Box 115\1\  scan0151
Date  23th November 1936
  
1020
To Rm. {William Robotham - Chief Engineer} from HPS {Horace Percy Smith - Experimental Factory Mgr} /WSC. {W. S. Cassel}
HPS {Horace Percy Smith - Experimental Factory Mgr} /WSC. {W. S. Cassel} 2/BA.23.11.36.

Bearings in Hoyts Z.3. Metal.

We have been running the week end on the above, the position now being as follows:

1 Set Phantom III Conn. Rod Bearings. 25.11.36.
Machining completed by
2nd Set " " " 28.11.36.

Phantom III Main Bearings. 24.11.36.
Machining completed by

1 Set 25/30. H.P. Main Bearings. 25.11.36.
Machining completed by. {R.W. Bailey - Chief Engineer}
2nd Set " " " 26.11.36.

HPS. {Horace Percy Smith - Experimental Factory Mgr}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙