Failure analysis report for various components over a six-month period, categorized by car model.

Identifier  ExFiles\Box 47\3\  Scan434
Date  1st March 1932 guessed
  
-12-

20 HP. 25 HP. PH.I. PH.II. TOTAL. GRAND TOTAL. REMARKS.

IGNITION COILS.
March Quarter. C.C. 9 3 9 - 21 } 26 Improved design of coil now
W.P. 2 - 3 - 5 } standard and applicable all
earlier cars. It is a
Previous " C.C. 7 3 6 2 18 } 23 definite improvement.
W.P. 4 - 1 - 5 }
-------------------------------------------------
Six months. 22 6 19 2 49 49

MAG. HIGH TENSION WIRES & TUBES.
March Quarter. C.C. - - - 5 5 } 14 Shield for H.T. Tube now available
W.P. - - - 9 9 } See Depot Sheet No.202.

Previous " C.C. - - - 8 8 } 18
W.P. - - - 10 10 }
-------------------------------------------------
Six months. - - - 32 32 32

MAGNETO FAILURES.
March Quarter. C.C. - - 2 5 7 } 13
W.P. - - 5 1 6 }

Previous " C.C. - - 5 5 10 } 11
W.P. - - 1 - 1 }
-------------------------------------------------
Six months. - - 13 11 24 24

PETROL TANK LEAKS.
March Quarter. C.C. - 3 - 1 4 } 5 The leakages are mainly from the
W.P. - 1 - - 1 } Air Vent Connection and a vellumoid
washer is now being fitted to cure
Previous " C.C. - 6 - 1 7 } 7 same. Depot Sheet No.222 deals
W.P. - - - - - } with this trouble.
-------------------------------------------------
Six months. - 10 - 2 12 12
  
  