Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts, testing India Tyres as an alternative to Dunlop tyres.

Identifier  ExFiles\Box 29\4\  Scan094
Date  4th March 1931
  
Header:
RR 788 (10M) (9-7-30) BM. 6/2571.
x4462. COMPLETED 25.11.31.
STANDARDISATION of CHASSIS PARTS.
Date 4. 3. 31.
X No. 4462.
Drawing No.
Part List

Main Section:
Description of Parts: India Tyres. Super Duty 6.00 X 19. for 4½ X 19. Wheel.
Origin: Alternative to Dunlop.

Experimental Test Report:
This tyre was tested with a view to having something that we could recommend to Customers who dislike Dunlops.

Road Test Report:
Run 10,000 miles 18.G.IV. These appear to be a reasonable compromise for silence and safety. The life is as good as anything we have previously had. Pressure 5 lbs/sq.in. less than Dunlops.

Decision Options:
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost Section:
Cost of Old Part: £ 10-1-8 (Handwritten: Alternative supply)
Cost of New Part: £ 12-15-0 (Handwritten: at customers)
Difference per Car: £ 2-13-4 Increase (Handwritten: request.)
Signature from Cost Dept. that above is correct: G R H 13/11/31, G.R.H. 13/11/31

Approval Table:
INITIAL | DATE | REMARKS
SG.{Arthur F. Sidgreaves - MD} | 16-11-31 | Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 12.4.31. | Agreed FHR.
WOR.{Arthur Wormald - General Works Manager} | 16.3.31. | Agreed Wor.{Arthur Wormald - General Works Manager}
C. | 11.3.31. | Agreed C. (As asked for).
RG.{Mr Rowledge} | 7.3.31. | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 7.3.31. | Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 9.3.31. | Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 6.3.31. | Agreed EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 9.3.31. | Agreed AE.
HS.{Lord Ernest Hives - Chair} | | Agreed Hs.{Lord Ernest Hives - Chair}

Stamps and Annotations:
Purple Stamp: 20/25 H.P. CHASSIS
Circular Stamp: 14 NOV J.S. XI XXIX IIXXX
Sideways Handwritten Note: Repl

Right Hand Boxes:
Cost of Parts in Works which will be scrapped if continued on :-
Series.......
Series.......
Series.......
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙