From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of automatic oiling for the clutch spigot from the gearbox.
Identifier | ExFiles\Box 20\1\ Scan056 | |
Date | 15th January 1931 | |
RR 755 (10H) (3-7-30) BM. C/2971. X872. COMPLETED 16.4.31. STANDARDISATION of CHASSIS PARTS. Date 15.1.31. Description of Parts. Automatic oiling of clutch spigot from gear box. Origin. To do away with hand oiling of spigot. Experimental Test Report. Scheme made similar to Phantom II which proved successful. Road Test Report. Fitted to 18.G.IV. and ran 10.000 miles. Clutch spigot was .over-oiled, modifications have been made to correct this. [STAMP] 20/25 H.P. CHASSIS Weight of Old Part. Weight of New Part. Difference per Car. Signature from Cost Dept. that above is correct. GRH 14/4/31 X No. X.872. Drawing No. X.5480 Part List No. NS.{Norman Scott} 2977 A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Altering stock to be effective on future Chassis. [X marked] Cost of Old Part. £ 12-5-11 Cost of New Part. £ 12-11-3 Difference per Car. £0- 5-4 Saving Cost of Parts in Works which will be scrapped if commenced on :- Series.........£....... Series.........£....... Series.........£....... [STAMP] 14 APR 1931 INITIAL DATE REMARKS SG.{Arthur F. Sidgreaves - MD} 14-4-31 Agreed Sg.{Arthur F. Sidgreaves - MD} R.{Sir Henry Royce} 1.2.31. Agreed FHR. WOR.{Arthur Wormald - General Works Manager} 16.1.31. Agreed Wor.{Arthur Wormald - General Works Manager} C. 20.1.31. Agreed C. RG.{Mr Rowledge} 19.1.31. Agreed Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} 21.1.31. Agreed Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} 19.1.31. Agreed By.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} 16.1.31. Agreed EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} 22.1.31. Agreed AE. PN.{Mr Northey} 21.1.31. Agreed PN.{Mr Northey} HS.{Lord Ernest Hives - Chair} Agreed Hs.{Lord Ernest Hives - Chair} | ||