Rolls-Royce Archives
         « Prev  Box Series  Next »        

Analysis of cost for tightening up bearings with the crankshaft in position.


Identifier  ExFiles\Box 115\1\  scan0258
Date  15th December 1936
  
Rm {William Robotham - Chief Engineer}
CHASSIS B.IO.GA - Baron BRINCARD
Analysis of cost of tightening up the Bearings etc..
with crankshaft in position.

Date: 15.12.36 - Mileage: 22.327 Kms Job N° 35946.

Labour
Hours
S SS {S. Smith}

OPERATIONS:
Removed lower half of crankcase, etc...
Carried out oil test,
Removed bearing caps,
Measured amount of sinkage of upper and lower
halves of main bearings,
Stepped upper faces of liners as necessary,
carried out oil test,
Cleaned dismantled parts,
Tested car on road before and after repairs

41 3/4 4

Cost of skilled labour...... Frs. 840,00
" " semi-skilled labour " 60,00
" " material " 10,40
" " petrol (5 litres AZUR)" 12,50
" " oil (3 litres XL)... " 19,80
Total cost of job..... Frs. 942,70 = £9.0.0.

VA 6/1/37
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙