Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts, specifically main bearings with steel shells.

Identifier  ExFiles\Box 6\1\  01-page032
Date  24th September 1926
  
RR. 723 REVISED (500) (RR.644 6-10-25) SM. X5010. COMPLETED 26.10.26
STANDARDISATION of CHASSIS PARTS.
Date 24.9.26
Description of Parts. MAIN BEARINGS WITH STEEL SHELLS.
Origin. To improve reliability.

Experimental Test Report.
The present bearings are half solid whitemetal and half bronze shells. It is proposed to use steel shells all round. These are standard on aero engines.

Road Test Report.
Run 12,000 miles on 10-G-111.
Run 3,000 miles on 9-G-111.
Run 8,500 miles on 11.G.111.

X No. 5010
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock. Alteration effective on future Chassis.

Weight of Old Part.
Cost of Old Part £1. 4. 0d.
Weight of New Part.
Cost of New Part £1. 16. 4d.
Difference per Car.
Difference per Car £ 12. 4d. increase.

Signature from Cost Dept. that above is correct. My/Hb{C. E. Harcombe} 2210.26.

Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.........
Series.........£.........
Series.........£.........

INITIAL | DATE | REMARKS
BJ. | 25.X.26 | agreed - presume
R.{Sir Henry Royce} | 1.10.26 | Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager} | 24.9.26 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 27.9.26 | Agreed. Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 1.10.26 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 11.10.26 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 27.9.26 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 1.10.26 | Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} | 29.9.26 | Agreed. PN.{Mr Northey}
CWB. | 25.9.26 | Agreed. CWB.
Hs.{Lord Ernest Hives - Chair} | 24.9.26 | Agreed. Hs.{Lord Ernest Hives - Chair}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙