Progress report for the Tank Section detailing completed work and work in hand.

Identifier  ExFiles\Box 133\4\  scan0262
Date  7th July 1941
  
Ev.{Ivan Evernden - coachwork}6/JH.16.7.41.

Progress Report - July 7th. 1941.
TANK SECTION.

Work completed.

PL.692 - Mods. to drilling Main inner side plates. - A.24.
PL.679 R.R. Suspension. -
Mod. gear selectors & operation - -
Meadows Gearbox. - Mk.6.
PL.713 Installation drg. - 5 speed S/Mesh Gearbox and epicyclic steering.
PL.714. Front G/Box mounting & coupling flange. R.R. gearbox and steering.
PL.715 Gleasons 25/28 hypoid gears in R.R. G/Box.
PL.698 Suggested engine with rear driven water pump. 1/4 scale. - Meteor.
PL.699. Dyno. test rig for tanks at Clan. - Plant.
PL.700. Prop. position for tank dyno. test house at Clan. - Plant.

Work in hand.

- Tank Suspension. A.24. - 50%
- Change gear control. Stage la.{L. A. Archer} - 50%
- Fitting 4.A. full flow filter (revised) " - 60%
+ Chain cum-belt fan drive - R.R. cooling A.24 - 90%
- Chain drive to fans and steering - R.R. type - abandoned.
- 1/4 scale layout of R.R. cooling. A.24. - 60%
- Liberty clutch and coupling. A.24. - abandoned.
- Radiator R.R. cooling. A.24. - abandoned.
- Mock-up of hull. A.24. - in hand.
- Air maze air cleaners in hull. MK.6. - in hand.

...........
  
  