Standardisation of chassis parts for wheels with 19' rims to reduce car height.

Identifier  ExFiles\Box 106\4\  scan0114
Date  24th April 1929
  
RR 755 REVISED (10H) (D.C. 777-29-2-28) M C. LTD
STANDARDISATION OF CHASSIS PARTS.
Handwritten: X5 8 10 Completed 15/5/29

Date 24. 4. 29
X No. 5810 (5728 crossed out)
Drawing No.
Part List

Description of Parts. WHEELS WITH 19" RIMS.

Origin. g/pk. To reduce height of car.

Experimental Test Report.
The rims are built on to standard hubs.

Road Test Report.
Run 8000 miles on 12-G4.
Run 2500 miles on 17-G3
When tyres are taken into account reduces axle ratio 4% approx.

POLICY OPTIONS:
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
X D Use existing stock Alteration effective on future Chassis.

Weight of Old Part.
Weight of New Part.
Difference per Car.

Cost of Old Part. £ 15-14-7
Cost of New Part. £ 15-14-7
Difference per Car. £ None

Signature from Cost Dept. that above is correct. G.L. 13/5/29. Agreed, EWT. 14/5/29

Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.......
Series.........£.......
Series.........£.......

APPROVALS:
INITIAL | DATE | REMARKS
EX. Sg.{Arthur F. Sidgreaves - MD} | 15-5-29 | Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 8. 5. 29 | Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager} | |
RG.{Mr Rowledge} | 29. 4. 29 | Agreed. RG.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 27. 4. 29 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 24. 4. 29 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 25. 4. 29 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 26. 4. 29 | Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} | |
C.W.B. | 29. 4. 29 | Agreed. C.
HS.{Lord Ernest Hives - Chair} | 24. 4. 29 | Agreed. Hs.{Lord Ernest Hives - Chair}

[STAMP - Faint Green] IDP CHAS
[STAMP - Blue Circular] Received 15 MAY 1929
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙