Cost estimation and production details for the standardisation of Phantom III parts.

Identifier  ExFiles\Box 171\2\  img343
Date  29th November 1938
  
Completed 15.11.38.
PHANTOM III STANDARDISATION of PARTS
Description of Part.
Drawing No. 10850
X 220
Report on Experimental No.

Estimated cost of new tools ....... £8. 0. 0.
Could be brought on to production at the 1st. chassis in "E" Series (without scrap)

MATERIAL | LABOUR | CHARGES | TOTAL
£ s d | £ s d | £ s d | £ s d
Cost of Old Part | 4 9 | 5 2 | 0 6 | 11 1
Cost of New Part | 4 4 | 2 3 | 0 3 | 7 9
Saving | - 5 | 2 11 | 0 3 | 3 4
TOTAL SAVING £ - 14 -

AMD. 29.11.38.
Signatures must be read from back Dept. as shewn above
INITIAL | DATE | REMARKS
SC | (30.11.38) | Agreed.
EH | (30.11.38) | Agreed.
C | (29.11.38) | Agreed.
YB | (30.11.38) | Agreed.
AG | (30.11.38) | Agreed.
RHC{R. H. Coverley - Production Engineer} | (30.11.38) | Agreed.
XM | (30.11.38) | Agreed.
MR | 30.11.38 | Design
  
  