Standardisation of the 40/50 water pump gland packing to obviate leaks and adjustment.

Identifier  ExFiles\Box 66a\3\  scan0147
Date  14th July 1927
  
RR 755 REVISED (10H) (DE649 9-12-26) BM. 2/1187.
48/50
COMPLETED 22.8.27.
STANDARDISATION of CHASSIS PARTS.
Description of Parts.
40/50 WATER PUMP GLAND PACKING.
Origin.
To obviate leaks and adjustment.
Experimental Test Report.
We conducted a series of tests on different types of packing and evolved the spring loaded soft asbestos rope gland as being the most efficient.
Road Test Report.
These glands are fitted to 12-EX, 10-EX and 14-EX. So far they have done 9000 miles without leaking or requiring adjustment. A definite improvement over the present standard.
Weight of Old Part.
Cost of Old Part. £ 7/8
Weight of New Part.
Cost of New Part. £ 9/5
Difference per Car.
Difference per Car. £ 1/9 increase
Signature from Cost Dept. that above is correct. G/RG{Mr Rowledge}
X No. 4590 8150
Drawing No. Fig. 1 Sch. 753
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Cost of Parts in Works which will be scrapped if commenced on:-
Series..........£.......
Series..........£.......
Series..........£.......
INITIAL | DATE | REMARKS
BJ. | 22.8.27 | Agreed. B.Johnson.
R.{Sir Henry Royce} | 16.7.27 | Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager} | 14.7.27 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 22.7.27 | Agreed. Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 19.7.27 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 12.8.27 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 1.7.27 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 20.7.27 | Agreed. E.{Mr Elliott - Chief Engineer} We should like to see a blueprint of this. We cannot trace one at WW.
PN.{Mr Northey} | |
CWB. | 15.7.27 | Agreed. CWB.
HS.{Lord Ernest Hives - Chair} | 14.7.27 | Agreed. Rms for Hs.{Lord Ernest Hives - Chair}
  
  