From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Test report on various moulding materials, detailing test conditions, results, and remarks.
Identifier | ExFiles\Box 50\5\ Scan085 | |
Date | 3rd July 1922 | |
Contd. -3- EFCl/T3.7.22. Date of test. | Moulding material. | Ref: | Carcase temp. reached previous to speed burst. | Test speed. | Duration of test speed. | Result. | Further remarks. ---|---|---|---|---|---|---|--- 23.6.22. | 1. Asbestos Elo. | a | 120 | 6250 | 2 mins. | Burst. | Only ferrule remained on shaft spindle. | 2. | b | 100 | 6000 | 3" | O.K. | (N.B. It being understood that the figures given for the comm. which remained O.K. refer to a continuation of the test after the first comm. had burst, so that really the second comm. was subject to both these tests) 24.6.22. | 1. Asbestos Elo. | b | 100 | 6000 | 3" | O.K. | | 2. Plain Elo. | c | 100 | 6000 | ¼" | Burst. | Moulded core remained on spindle but was cracked longitudinally. 27.6.22. | 1. Asbestos Elo. | b | 93 | 6000 | ¼" | O.K. | | 2. Mouldensite. | d | 93 | 6000 | ¼" | Failed. | 6 segments only flew out. 27.6.22 | 1. Asbestos Elo. | b | 83 | 6000 | 3" | O.K. | | 2. Mouldensite + | e | 83 | 6000 | 3" | O.K. | 28.6.22. | 1. Ditto (continuation). | e | 100 | 5500 | ¼" | Failed. | 6 segments flew out. | 2. | e | 100 | 5500 | ¼" | | 28.6.22 | 1. Asbestos Elo. | b | 105 | 6000 | ¼" | O.K. | | 2. Bakelite. | f | 105 | 6000 | ¼" | Burst. | Only moulded core remained. speed momentarily obtained 6420. 29.6.22 | 1 Mouldensite + | g | 100 | 6200 | 3" | O.K. | -> | 2. Plain Elo. | h | 100 | 6200 | 3" | O.K. | -> 29.6.22. | 1. Mouldensite. + | g | 110 | 6100 | ¼" | Burst. | Moulded core remained on spindle. | 2. Plain Elo. | h | 107 | 6000 | 3" | O.K. | + In this case the commutator was baked for 24 hours at 140°C previous to being handed over for test. | ||