Rolls-Royce Archives
         « Prev  Box Series  Next »        

Bearing pre-load and fitting difficulties with the split pin on Bentley 5 front brakes and hubs.


Identifier  ExFiles\Box 98\3\  scan0094
Date  27th April 1939
  
466

To: BY {R.W. Bailey - Chief Engineer} /CRL. {C. R. Lisson}
c. to Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls}
c. to HPS {Horace Percy Smith - Experimental Factory Mgr} /RH. {R. Hollingworth}

BY {R.W. Bailey - Chief Engineer} /NS. {Norman Scott} 3/MG.27.4.39

BENTLEY 5

FRONT BRAKES & HUBS.

Pre-load of Angular Contact Bearing to be .002-1/2 Please put note covering this on the arrangement.

Experimental report that water shields foul the Brake Drum on the Front. See Sketch.

Difficulty is experienced in fitting the split pin to the Bearing Retaining Nut, due to the Hub projecting far beyond the nut. Please drill one hole in the hub of sufficient size to allow the split pin head to be passed through.

The above are reported by HPS {Horace Percy Smith - Experimental Factory Mgr} /RH {R. Hollingworth} /Goreing

CHECK DRAWINGS AND PROVIDE CLEARANCE

HOLE FOR SPLIT PIN.

BY {R.W. Bailey - Chief Engineer} /NS. {Norman Scott}

NS {Norman Scott}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙