From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Modification to add drainage slots to the hot box on the Phantom III induction system.
Identifier | ExFiles\Box 93\3\ scan0086 | |
Date | 1st February 1936 | |
X 308 To BY.{R.W. Bailey - Chief Engineer} [BY is struck through] Copy to RHC.{R. H. Coverley - Production Engineer} Hs{Lord Ernest Hives - Chair}/Rm.{William Robotham - Chief Engineer} Hs{Lord Ernest Hives - Chair}/Swdl.{Len H. Swindell} [RHC.{R. H. Coverley - Production Engineer} and Hs{Lord Ernest Hives - Chair}/Swdl.{Len H. Swindell} are struck through] E/PSN.1/MN.1.2.36. GRY{Shadwell Grylls} [handwritten] Phantom III Induction System. ------------------------- We send you herewith LeC 4969 of the addition of drainage slots to the hot box on the above induction system, which have been found necessary as a result of tests by the Experimental Dept. We should be pleased if you would detail this modification to be added to the existing pattern. E/PSN. Att: LeC 4969. | ||