Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Modification to add drainage slots to the hot box on the Phantom III induction system.

Identifier  ExFiles\Box 93\3\  scan0086
Date  1st February 1936
  
X 308
To BY.{R.W. Bailey - Chief Engineer} [BY is struck through]
Copy to RHC.{R. H. Coverley - Production Engineer} Hs{Lord Ernest Hives - Chair}/Rm.{William Robotham - Chief Engineer} Hs{Lord Ernest Hives - Chair}/Swdl.{Len H. Swindell} [RHC.{R. H. Coverley - Production Engineer} and Hs{Lord Ernest Hives - Chair}/Swdl.{Len H. Swindell} are struck through]
E/PSN.1/MN.1.2.36.
GRY{Shadwell Grylls} [handwritten]
Phantom III Induction System.
-------------------------
We send you herewith LeC 4969 of the addition of drainage slots to the hot box on the above induction system, which have been found necessary as a result of tests by the Experimental Dept.
We should be pleased if you would detail this modification to be added to the existing pattern.
E/PSN.
Att: LeC 4969.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙