From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Attaching design progress reports for two separate two-week periods.
Identifier | ExFiles\Box 133\4\ scan0269 | |
Date | 16th September 1941 | |
1125 To Rm.{William Robotham - Chief Engineer} from Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames} c. to Ev.{Ivan Evernden - coachwork} [Strikethrough] c. to Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer} [Strikethrough] Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}8/JH.16.9.41. re Progress Report. We attach herewith the design progress report for the two weeks ending Aug. 4th. 1941, also the two weeks ending Aug. 18th. 1941. Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames} | ||