The increase in diameter of holes for Hythe body mounting brackets.
| Identifier | ExFiles\Box 109\2\ scan0262 | |
| Date | 23th June 1941 | |
| 404 Copy to Rm {William Robotham - Chief Engineer} /HH. Ev. {Ivan Evernden - coachwork} Rm {William Robotham - Chief Engineer} /EAG. Ev {Ivan Evernden - coachwork} /DB. {Donald Bastow - Suspensions} 10/ST.23.6.41. BODY MOUNTING BRACKETS - HYTHE. ------------------------------- It has been agreed with Rm {William Robotham - Chief Engineer} /EAG. that the present 3/4" dia- meter holes in the Hythe body mounting brackets shall be increased to 1" diameter (see Rm {William Robotham - Chief Engineer} /AMD.12/W.20.6.41 from Rm {William Robotham - Chief Engineer} /EAG. to Ev {Ivan Evernden - coachwork} /JD {J. Draper - Frames} ). Will Rm {William Robotham - Chief Engineer} /HH. please take the necessary steps. Ev {Ivan Evernden - coachwork} /DB. {Donald Bastow - Suspensions} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
