Status report on the production of frames and fittings for the Bentley III model.

Identifier  ExFiles\Box 97\1\  scan0075
Date  2nd November 1937
  
200B. FILE
BENTLEY III.

We give herewith the position of the Bentley III as we know it at present.

Frames & Fittings.

FB.2937/8 Frame Side Members )
FB.2948/9 Channels Cruciform )
FB.3081/2 Frame Gussets ) 6 Sets of these parts have been obtained from Messrs. John Thompson. One is built up, now on bumping. 2 sets assembled. 3 sets unassembled. In addition to the above 2 sets have been ordered in lighter gauge material, 1 set has been delivered and built up, and is now on twisting tests.

FB.3021/2 Rear Shackle Brkts )
FB.3023 End Supports ) Dies sunk, and forgings obtained, 6 sets.

FB.3092 Anchor Brackets One set produced from solid dies now completed, 3 sets of forgings in hand.

FB.3159 Support for Starting) Hand Bracket )
FB.3161 Bumper Bracket ) Two sets have been produced in Bz/A castings, no dies are instructed.

3 Pairs of Side Members, Frame Gussets and Cruciform Members to F.C.D.139 and 155 ordered 2.11.37.

Handwritten text:

2 FRAMES
ONE FOR TWISTING

BENTLEY III FRAME DETAIL DRAWINGS. THREE WEEKS. 24TH INST

FRAMES AT END OF WEEK

AS BEFORE.

UNALTERED

O.K.