Rolls-Royce Archives
         « Prev  Box Series  Next »        

Failed coil from chassis 3-PP, requesting a failure analysis and repair.


Identifier  ExFiles\Box 46\3\  Scan173
Date  1st March 1920
  
R.R. A {Mr Adams} /cs (200 T) (S.F. 674, 22-5-19) G. {Mr Griffiths - Chief Accountant / Mr Gnapp} 2376.

[strikethrough]By[/strikethrough] from EP. {G. Eric Platford - Chief Quality Engineer}
c. to Ck. {Mr Clark}
c. to Sft. {Mr Swift}

X.3445
F.R.
FR

EP {G. Eric Platford - Chief Quality Engineer} /T1/H1.3.20.

X.3445 RR Coils - general

We hand you herewith Coil removed from 3-PP
which has failed after delivery of chassis.

We shall be glad if you will let us have a
report on this failure, also please have this put in order
and returned to us as quickly as possible.

EP. {G. Eric Platford - Chief Quality Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙