Progress report for the week ending 30th May 1940, detailing work completed and in hand on various models.
| Identifier | ExFiles\Box 133\4\ scan0165 | |
| Date | 6th May 1940 | |
| To. Rm. {William Robotham - Chief Engineer} c. Ev. {Ivan Evernden - coachwork} Rm {William Robotham - Chief Engineer} /HH.2/ 6. 5. 40. PROGRESS REPORT for week ending 30th May 1940. WORK COMPLETED RIPPLET PL. 107 Gordon Armstrong Shock Damper. PL. 145 Gordon Armstrong Shock Damper. Transmission as specified in memo EV {Ivan Evernden - coachwork} /4/JH 22. 2. 40 and Rm {William Robotham - Chief Engineer} /FJH {Fred J. Hardy - Chief Dev. Engineer} 8./MS 1 9. 3.40 Mounting of Vauxhall Pump Rationalised Water Pump to Scd. SCD 1398 PL. 72 Crankshaft Intergral (Wrights & Welch Washers) Suspension springs to memo: Ev {Ivan Evernden - coachwork} /DB {Donald Bastow - Suspensions} 10/JH.12.3.40 Lightened Type Triangular Levers L.H.Silver Phantom Transmission as specified in memo: Ev {Ivan Evernden - coachwork} /4/JH. 22.2.40 and Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer} 8/MS 9.3.40. Radiator Assemblies (Complete) PL. 161 Twin Coil Mounting on dash PL. 141 Front Brake Mechanism Rationalised Water Pump. RIPPLETTO. Frame Makers Assembly Suspension springs to memo Ev {Ivan Evernden - coachwork} /DB. {Donald Bastow - Suspensions} 10/JH. 12.3.40 PL. 34 Engine Mounting Rationalised Water Pump. WORK IN HAND RIPPLETTO PL. 282. Fan. Detailing of Salisbury Axle PL. 177 12 Gallon Petrol Tank PL. 188 12 Gallon Petrol Tank over | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).