From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The production schedule for J.111 bodies, including requirements for wheel arch drawings.
Identifier | ExFiles\Box 102\2\ scan0060 | |
Date | 12th February 1932 | |
WOR{Arthur Wormald - General Works Manager} from E, Sg.{Arthur F. Sidgreaves - MD} Hs.{Lord Ernest Hives - Chair} By.{R.W. Bailey - Chief Engineer} RHC.{R. H. Coverley - Production Engineer} X5830. E.{Mr Elliott - Chief Engineer} 2/G.12.2.32. J.111 BODIES. ------- Referring to the above subject, I have an undertaking from EV.{Ivan Evernden - coachwork} that the first body will be ready to drop on the chassis in five weeks from Monday next. The drawings for the cast aluminium wheel arches should be here this weekend at latest for RR. to make the patterns and castings. Meanwhile the coachbuilders will be preparing the body frames etc. E.{Mr Elliott - Chief Engineer} | ||