From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts, specifically a new, more accessible position for the coil, high tension wires, and ballast resistance.

Identifier  ExFiles\Box 172\2\  img013
Date  14th June 1923
  
STANDARDISATION of CHASSIS PARTS.

Description of Parts.
NEW POSITION OF COIL - HIGH TENSION WIRES - BALLAST RESISTANCE.

Origin.
To obtain a more accessible position.

Experimental Test Report.
The new position of coil enables the cover to be removed from the valve rockers more easily.
We consider it is a neat-er arrangement.
With regard to temperature - the coil in the new position does not make any noticeable difference.

Road Test Report.
With Bakelite material for coil cases, we had failures when the coil was in this new position - if we retain the Stabalite cases, it is quite satisfactory.
Run 6420 miles on 7-G-11.
" 3150 " " 3-G-11.
We recommend this new position.

COMPLETED 22.6.23

Drawing No.
Part List

A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on:-
Series......... £.........
Series......... £.........
Series......... £.........

Storekeeper advised re above:
Storekeeper's Signature

Signature of Exp. Dept. that above is correct. E.{Mr Elliott - Chief Engineer} Hives./EFC.

Weight of Old Part.
Cost of Old Part. £ ---

Weight of New Part.
Cost of New Part. £ ---

Difference per Car.
Difference per Car. £ ---

Signature of Mr. De LOOSE that above is correct.

SIGNATURES | DATE | REMARKS
Mr. JOHNSON | 21.6.23 | Agreed. CJ.
Mr. E.{Mr Elliott - Chief Engineer} Johnson. | 21.6.23 | Agreed. WJ.
Mr. ROYCE | 19/6/23 | Agreed FHR
Mr. WORMALD | 15.6.23 | Agreed. Wor.{Arthur Wormald - General Works Manager}
Mr. ROWLEDGE | 15.6.23 | Agreed. Rg.{Mr Rowledge}
Mr. DAY | 15.6.23 | Agreed DO
Mr. BAILEY | 19.6.23 | Agreed. BY.{R.W. Bailey - Chief Engineer}
Mr. PLATFORD | 18.6.23 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
Mr. NORTHEY | 15.6.23 | Agreed. PN.{Mr Northey}
  
  