Standardisation of larger bolts for the axle control bracket to prevent them from coming loose.
| Identifier | ExFiles\Box 84\3\ scan0211 | |
| Date | 26th February 1934 | |
| RR 7898N (SH) (57312. 29-12-33) BM. 3/640/2 X 201 Completed 14.3.34. BENTLEY STANDARDISATION of PARTS. Date 26.2.34. Description of Parts. AXLE CONTROL - LARGER BOLTS HOLDING CONTROL BRACKET TO AXLE. Origin. To overcome control bracket bolts coming loose. Report of Experimental Test. Similar bolts used on axle of 4-B-IV, which has run 10,000 miles, without coming loose. 201. X No. N. Sch. 3749. Drawing No. F.3689/90. Part List Weight of Old Part. Cost of Old Part. £ Weight of New Part. Cost of New Part. £ Difference per Car. Difference per Car. £ NEGLIGIBLE Cost of Parts in Works which will be scrapped if commenced on :- Series..........£......... Series..........£......... Signature from Cost Dept. that above is correct. G.R.L. 3.3.34 INITIAL DATE REMARKS SG. {Arthur F. Sidgreaves - MD} 13-3-34. Agreed Sg. {Arthur F. Sidgreaves - MD} WOR. {Arthur Wormald - General Works Manager} 6.3.34. Agreed Wor. {Arthur Wormald - General Works Manager} C. 6.3.34. Agreed C. RG. {Mr Rowledge} Rg. {Mr Rowledge} absent. DA. {Bernard Day - Chassis Design} 12.3.34. Agreed Da. {Bernard Day - Chassis Design} BY. {R.W. Bailey - Chief Engineer} 6.3.34. Agreed By. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} 5.3.34. Agreed EP. {G. Eric Platford - Chief Quality Engineer} E. {Mr Elliott - Chief Engineer} 7.3.34. Agreed AE. MN. BN. {W.O. Bentley / Mr Barrington} 6.3.34. Agreed Bn. {W.O. Bentley / Mr Barrington} SFT. {Mr Swift} 5.3.34. Agreed Sft. {Mr Swift} MX. {John H Maddocks - Chief Proving Officer} 5.3.34. Agreed Mx. {John H Maddocks - Chief Proving Officer} HS. {Lord Ernest Hives - Chair} 5.3.34. Agreed Hs. {Lord Ernest Hives - Chair} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).