Rolls-Royce Archives
         « Prev  Box Series  Next »        

Outlining the estimated factory labour costs for four operations on a Wraith Cylinder Liner.


Identifier  ExFiles\Box 148\2\  scan0191
Date  9th June 1939
  
1260.
To Rm {William Robotham - Chief Engineer} /Mr. Salt. from G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen}
G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 9/A/73/R.9.6.39.

Wraith Cylinder Liner EW.2179/80

In reply to your request, we give below estimated Factory cost of labour only for each of the four individual operations, as referred to in the accompanying Op.List, and to drawing Ml.1388.

£. s. d. {John DeLooze - Company Secretary}
Op.1 Turn outside dia. bore face chamfer end and part off. (Hand turret) 2 - 5
Op.2 Face and chamfer other end. (C'lathe) 3½
Op.3. Stamp Part No. (Fitters) 0½
Op.4 Grind outside dia. (External Grinders) 1-11

It should be understood that the figures are for the work as stated and do not pretend to cover work which may be incidental, consequent upon the fitting of liners to the block.

G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙