From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The cost and details of experimental scrap due to incorrect chassis drawings for a four-week period.
Identifier | ExFiles\Box 148\2\ scan0133 | |
Date | 10th March 1939 | |
1260 To B.J. from HPS {Horace Percy Smith - Experimental Factory Mgr} /Ker. c. Rm. {William Robotham - Chief Engineer} HPS {Horace Percy Smith - Experimental Factory Mgr} /Ker.1/EP. {G. Eric Platford - Chief Quality Engineer} 10.3.39. Re: Experimental Scrap, The amount of Experimental scrap due to Chassis Detail drawings being incorrect, for the four weeks ending Feb.25th, is as follows :- £. s. d. {John DeLooze - Company Secretary} Labour. 11. 6. Material. 2. 0. Total .... 13. 6. Details of scrap are as follows :- Qty. Piece No. Description. Reason for scrap. 10 B.4482 Adj. washer. Piece increased in thickness. No scrap involving design changes. HPS {Horace Percy Smith - Experimental Factory Mgr} /Ker. | ||