Standardisation of chassis parts, specifically asbestos valve guide washers for the 20 HP model.

Identifier  ExFiles\Box 172\1\  img174
Date  1st September 1930
  
RR 755 (10M) (3-7-30) BM. 6/2571.
ORIGINAL
COMPLETED 17.10.30.
STANDARDISATION of CHASSIS PARTS.
Date 1.9.30.
Description of Parts.
ASBESTOS VALVE GUIDE WASHERS ON THE 20 HP.
X No. 5060
Drawing No.
Part List
Origin.
To reduce over-oiling when idling.
Experimental Test Report.
These have a greater life than the felt washers and are a more effective seal.
Road Test Report.
Running on 16-GIV and 18-GIV 5000 miles. The same scheme has run 20,000 miles on Phantom II.
[STAMP: UP-GRADED CHASSIS]
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part.
Weight of New Part.
Difference per Car.
Cost of Old Part. £- 17. 7d.
Cost of New Part. £- 18. 3d.
Difference per Car. £- - 8d. Increase.
Cost of Parts in Works which will be scrapped if commenced on :-
Series..........£.........
Series..........£.........
Series..........£.........
Signature from Cost Dept. that above is correct. G/Rb.{R. Bowen}13.10.30 G14.10.30. Wob.
INITIAL | DATE | REMARKS
SG.{Arthur F. Sidgreaves - MD} | 15.10.30 | Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 5/9/30 | Agreed RWR
WOR.{Arthur Wormald - General Works Manager} | 1.9.30 | Agreed Wor.{Arthur Wormald - General Works Manager}
C. | | Agreed C.
RG.{Mr Rowledge} | 2.9.30 | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 3.9.30 | Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 2.9.30 | Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 1.9.30 | Agreed EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 2.9.30 | Agreed AE.
PN.{Mr Northey} | 4.9.30 | Agreed PN.{Mr Northey}