Rolls-Royce Archives
         « Prev  Box Series  Next »        

Log sheet for a bump test on a front chassis, detailing component failures over time.


Identifier  ExFiles\Box 45\3\  Scan114
Date  2nd October 1920
  
SGFE X1331 BUMP TEST - FRONT CHASSIS. X.4062 2.10.20
New type rear engine suspension brackets.
Dunlop wire wheels with 72 spokes.

Date. hrs. run. Remarks.
17.9.20 4 O.K.
18.9.20 6 hrs. 25 N.S. diagonal stay bolt K.7407 broken.
20.9.20 9 " 20 Petrol tank supports rivets loose - replaced by bolts - shock absorbers dis-connected.
21.9.20 10 " 40 O.S. spring broken.
22.9.20 339 " 35 - on rear. Petrol tank taken off.
44 " 25 - " front. Shock absorber supports fastened inside tank loose.
22.9.20 18 " 25 O.K.
23.9.20 21 " 40 N.S. spring broken.
24.9.20 23 " 20 O.S. spring broken.
25.9.20 23 " 45 O.K.
27.9.20 26 " 35 New type rear engine suspension brackets tightened up - N.S. 1/3rd. of a turn O.S. 1/16th. " " " Brackets appear to be too weak.
27.9.20 29 " 5 O.K.
28.9.20 36 " 30 N.S. spring broken.
29.9.20 39 " 35 O.S. spring broken.
30.9.20 43 " 0 Front Shock abs: ball end on axle, nut loose
1.10.20 46 " 20 O.S. spring broken.
2.10.20 49 " 55 O.K.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙