From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Design work completed and in progress for the Phantom III Chassis.
Identifier | ExFiles\Box 161a\4\ scan0196 | |
Date | 17th March 1937 | |
Sg.{Arthur F. Sidgreaves - MD} and Hs.{Lord Ernest Hives - Chair} (crossed out) c. Ey. Rm.{William Robotham - Chief Engineer} RHC.{R. H. Coverley - Production Engineer} HPS.{Horace Percy Smith - Experimental Factory Mgr} (crossed out) 382 E/Lid.{A. J. Lidsey}4/HP.17.3.37. Phantom III Chassis. We attach herewith a list of the design work completed on the Phantom III chassis during the last month, and in addition particulars of work at present in hand. The main item of design work on this chassis has been various small schemes in connection with overcoming the over-oiling trouble. A scheme has been completed and issued for a thrust stay between the engine and gearbox, and we have also issued a design for a standard S.U. petrol pump to be used in conjunction with the R.R. S.U. twin pump unit. E/Lid.{A. J. Lidsey} | ||