Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Design position report detailing the status of various components for the Bentley Chassis.

Identifier  ExFiles\Box 30\4\  Scan346
Date  24th December 1935
  
ITEM. DESIGN POSITION.

BENTLEY CHASSIS.

SpectreCodename for Phantom III type oil seal - rear main bearing. Put aside.
Rubber mounted petrol pumps. Completed 11.12.35.
Position of wind tone horn relay unit on dashboard. Completed 13.12.35.
Radiator grille - Packard type. Completed 13.12.35.
Forged connecting rod. In hand.
Two tone horn switch. Completed 24.12.35.
Perfect oil seals on foot brake countershaft and less costly pedal return spring anchorage. Completed 19.12.35.
Increased travel for Borg and Beck clutch to facilitate adjustment. In hand.
Petrol feed and drain pipes - 4 1/4 litre engine. Completed 19.12.35.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙