Standardisation of chassis parts by fixing the radiator 1 inch higher to improve coachwork.

Identifier  ExFiles\Box 66\3\  scan0073
Date  21th March 1923
  
R R 755 (5 H) (S H 268, 20-9-20) G 2854
V3726
COMPLETED 24.4.23.
STANDARDISATION of CHASSIS PARTS.
Description of Parts.
RADIATOR FIXED 1" HIGHER.
Origin.
To improve coachwork.

Experimental Test Report.
We have made this modification to a number of chassis at customers special request. It does enable the coach-builder to produce a more satisfactory body.

Road Test Report.
Fitted to about 10 chassis delivered to customers. No trouble.

Signature of Exp. Dept. that above is correct. E.{Mr Elliott - Chief Engineer} Hives.
Weight of Old Part.
Cost of Old Part. Radiator as made in R.R. Works. £50. 16. 0
Weight of New Part.
Cost of New Part. Radiator to be made in R.R. Works. £51. 1. 0
Difference per Car. £ 5. 0 increase.

Signature of Mr. De LOOZE that above is correct. My/JW.

Date 21.3.23.
X No. 3726
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on:-
Series......... £.........
Series......... £.........
Series......... £.........
Storekeeper advised re above:
Storekeeper's Signature.

SIGNATURES | DATE | REMARKS
Mr. JOHNSON / Mr. B. Johnson. | 12.4.23 | Agreed BJ. *CJ had agreed before he went abroad S/12
Mr. ROYCE | 20.4.23 | Assume no scrap necessary
Mr. WORMALD | 11.4.23 | Agreed. Wor.{Arthur Wormald - General Works Manager} One is surprised at the radiator costing this amount - an effort should be made to reduce this. Agreed. FHR.
Mr. BARRINGTON (struck through) / Mr. Rowledge. | 22.3.23 | Agreed. Rg.{Mr Rowledge}
Mr. DAY | 26.3.23 | Agreed. Da.{Bernard Day - Chassis Design}
Mr. BAILEY | 23.3.23 | Agreed. BY.{R.W. Bailey - Chief Engineer}
Mr. PLATFORD | 22.3.23 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
Mr. NORTHEY / EWT for R.R. Inc. | 23.3.23 | Agreed. PN.{Mr Northey}