Rolls-Royce Archives
         « Prev  Box Series  Next »        

Clarifying a misunderstanding regarding the fitting of different weight road springs due to availability.


Identifier  ExFiles\Box 154a\4\  scan0008
Date  25th November 1936
  
1306

RHC. {R. H. Coverley - Production Engineer}
C.H.H.
C.Rm. {William Robotham - Chief Engineer}

RHC {R. H. Coverley - Production Engineer} /TVT. {T. V. Turner} 1/IB. 25.11.36.

re. CHASSIS ROAD SPRINGS
-------------------------

With reference to paragraph one in memo' Rm {William Robotham - Chief Engineer} /LES18/AP.20.11.36.. I think there must be some misunderstanding. I do not agree that RHC. {R. H. Coverley - Production Engineer} was misinformed. The point I raised with RHC. {R. H. Coverley - Production Engineer} was: would I be in order in fitting 1350 lbs. Road Springs on chassis for this week's production as there were no 1400 lbs springs available.

The chassis 3-AX-87 was never mentioned. This chassis left the Erecting Bay on 2.10.36.

RHC {R. H. Coverley - Production Engineer} /TVT. {T. V. Turner} JVS
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙