Rolls-Royce Archives
         « Prev  Box Series  Next »        

Design position report detailing the progress of components for the Spectre and Wraith chassis.


Identifier  ExFiles\Box 30\4\  Scan269
Date  5th September 1934 guessed
  
(4)

ITEM
DESIGN POSITION.

SPECTRE(Codename for Phantom III) CHASSIS - CONT'D. {John DeLooze - Company Secretary}

Investigation of automatic chassis lubrication.
In hand.

Carbon Thermoflex gland - water pump.
In hand.

Vacuum control for ignition distributors.
In hand.

External modifications to cylinder head to facilitate enamelling.
In hand.

Lightened valve with spring retaining ring.
In hand.

Alternative springs for front suspension.
Completed.

WRAITH CHASSIS.

Rear wheel and brake drum.
In hand.

Preliminary chassis layout.
In hand.

Cylinder head auto tappets and valves.
In hand.

Layout of close coupled saloon.
In hand.

All helical gearbox. - gears shafts and bearings.
Completed.

" " " front half actuating mechanism.
In hand.

" " " front half casing.
In hand.

Induction system.
In hand.

Twin down draught carburetters.
In hand.

Water pump and dynamo drive.
In hand.

Wheelcase and chain drive.
In hand.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙