Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Inspection and test specification for a sequence starter main switch unit.

Identifier  ExFiles\Box 168a\2\  img088
Date  20th March 1941
  
SEQUENCE STARTER
MAIN SWITCH UNIT

SPECIFICATION OF PRODUCTION INSPECTION & TEST

I. GENERAL INSPECTION.
(1) Ascertain that the copper laminated contacts of the main switch unit offer a satisfactory bedding in correct sequence on the copper contact plate of the main switch pillar. This bedding is very important.
(2) Ascertain that the copper flexible connections on the switch shows no sign of fraying.
(3) Examine also the carbon contacts for correct surface bedding, when the switch is depressed by a force applied to the main lever (armature). It is important that the switch be not depressed by pressing the top carbon contact arm. It should also be ascertained that the carbons are not cracked or chipped through tightening the securing clamp.
(4) It should be verified particularly that all screws upon which electrical contacts depend are thoroughly tight.
(5) Inspect generally the small Eureka wire oooin resistance which is connected in parallel with the main switch operating coil.
(6) It should be verified that there is not more than .004" clearance between the main switch armature and main support when the former is fully depressed to the armature stop.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙