Cost and implementation proposal for a production modification involving a sleeve and caps for a chassis.


Identifier  ExFiles\Box 171\2\  img358
Date  21th November 1938
  
PHANTOM III STANDARDISATION of PARTS

Estimated cost of new tools ......... £18.0.0.

Could be brought on to production at the 1st. chassis in "A" series (without scrap).

Use Sleeve E.89030 sweated inside existing end caps E.84967/8 which will involve a tool cost of £9.0.0d. and an increase in factory cost of 1/- per chassis. This could be introduced without scrap as soon as tools are available, i.e. in about 6 weeks time, and is the scheme which ran 17,000 miles on 32-EX.

Table Columns:
MATERIAL, LABOUR, CHARGES, TOTAL
Signature, DATE, REMARKS

Table Data:
Signature: EB, Date: 22.11.38
Signature: HS {Lord Ernest Hives - Chair} , Date: 22.11.38
Signature: C, Date: 22.11.38
Signature: VB, Date: 23.11.38
Signature: AG, Date: 23.11.38
Signature: RHC {R. H. Coverley - Production Engineer} , Date: 24.11.38
Signature: XM, Date: 25.11.38
Signature: MR, Date: 28.11.38
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙