Rolls-Royce Archives
         « Prev  Box Series  Next »        

Chassis conference notes for the Phantom III, detailing proposed items for a 10,000-mile test.


Identifier  ExFiles\Box 161a\2\  scan0232
Date  23th May 1938
  
CHASSIS CONFERENCE - 23RD. MAY 1938.
PHANTOM III.
1381

The following is a list of major items which it is proposed to fit on the next 10,000 miles test.

DESCRIPTION.
REMARKS.

Crankshaft - .4% Carbon steel with Packard type balance weights to ECD. 284.
New Dies and Web Grinding tackle etc., required. Slight C'case pattern alteration necessary. Approx saving per chassis £7.0.0d. Saving is provided by cheaper material, also simplified forging and machining. Tool cost including Dies £800.0.0d. recovered after 110 chassis.
(Handwritten) REPORT ON MATERIAL FOR CRANKCASE % SCRAP REPORT

Dynamo & Water Pump - running at 1 1/2 X engine speed to provide lower dynamo cutting in speed. ECD.551. ECD. 623.
Mods to crankcase & wheelcase patterns and jigs required. New Water Pump casing & Cover. New dynamo pinion, existing dynamo idler & dynamo pinion centres altered. Factory cost of chassis would not be greatly affected but tool cost of about £125.0.0d. involved.
(Handwritten) ANY OTHER ECONOMIES

Oil Pump - Relief Valve & Pressure Filter altered. These mods necessary to clear side steering tube used with Wraith wheel movement introduced at 1 in E.Series.
Snout angle altered in oil pump casing. New relief valve casing. A {Mr Adams} /C Filter (as on Wraith) replacing present R.R.Filter. Present R.R. Filter complete costs 30/- Proposed A {Mr Adams} /C Filter 2/6d.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙