The production status and potential redesign of the Wraith Water Pump for 'B' and 'C' series chassis.

Identifier  ExFiles\Box 149a\1\  scan0323
Date  17th November 1938
  
1269. STD

To [REDACTED] & Rm.{William Robotham - Chief Engineer} From RHC.{R. H. Coverley - Production Engineer}

RHC.{R. H. Coverley - Production Engineer}1/MC.17.11.38.

Water Pm / S809

WRAITH WATER PUMP

With reference to EY.6/G.16.11.38., we would state that Water Pumps are now actually assembled for chassis up to 150 in "B" series, whilst material for the remaining 50 chassis of "B" series is in a finished condition.

When this question was previously raised it was pointed out in our memo' RHC.{R. H. Coverley - Production Engineer}1/MD.15.10.38., that considerable dislocation would arise if a new design were introduced during "B" series, whilst any change at the present juncture would have infinitely more serious results.

Since the new pump cannot be introduced before "C" series without retarding production, it, therefore appears that retrospective action will be necessary to overcome these complaints.

RHC.{R. H. Coverley - Production Engineer}
  
  